{"id":15086,"date":"2016-06-28T12:27:34","date_gmt":"2016-06-28T17:27:34","guid":{"rendered":"http:\/\/www.conservators-converse.org\/?p=15086"},"modified":"2016-06-28T12:27:34","modified_gmt":"2016-06-28T17:27:34","slug":"44th-annual-meeting-collection-care-session-may-15-spoiler-alert-planning-around-the-pitfalls-of-construction-projects-by-jeffrey-hirsch-and-angela-matchica","status":"publish","type":"post","link":"https:\/\/resources.culturalheritage.org\/conservators-converse\/2016\/06\/28\/44th-annual-meeting-collection-care-session-may-15-spoiler-alert-planning-around-the-pitfalls-of-construction-projects-by-jeffrey-hirsch-and-angela-matchica\/","title":{"rendered":"44th Annual Meeting \u2013 Collection Care Session, May 15, &quot;Spoiler alert! Planning around the pitfalls of construction projects&quot; by Jeffrey Hirsch and Angela Matchica"},"content":{"rendered":"<p>Construction projects have been on my mind lately and I thought this would be a good complement to Angela Chang\u2019s presentation about her experiences during two major\u00a0construction projects at the Straus Center (she spoke at the <a href=\"http:\/\/www.conservation-us.org\/docs\/default-source\/education\/conservation-exhibition-planning-conference-programB4720C8898D7.pdf?sfvrsn=2\">Conservation &amp; Exhibition Planning: Material Testing for Design, Display, and Packing<\/a> conference in DC in November 2015). Jeffrey Hirsch and Angela Matchica from <a href=\"http:\/\/ewingcole.com\">Ewing Cole<\/a> (an architect-design-engineering-planning firm) put together a clear and useful review of how conservators and collections care professionals can be active participants in a construction planning process. They took turns speaking, with Jeffrey giving an overview of each issue or area of collaboration, and Angela providing the in-practice examples from her experience as a lighting designer. The concrete examples were helpful in illuminating how collaboration goals can be translated into actual practice and decision making.<br \/>\nJeffrey emphasized the complexity of the team on both sides of a museum construction project, with a wide variety of interests being represented. He noted that while those from Facilities departments are probably used to talking to architects and designers, the rest of the museum representatives may not initially be as comfortable, but need to make the time to stay at the table and speak up whenever they have questions.\u00a0The slide below started out as just two dots &#8211; Design Team and Museum &#8211; and then grew and grew to encompass all the different roles that are part of the discussions around planning a new space or changes to an existing space.<br \/>\n<a href=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-people-at-the-table.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-15133 aligncenter\" src=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-people-at-the-table-300x171.jpg\" alt=\"Hirsch Matchica people at the table\" width=\"361\" height=\"206\" \/><\/a><br \/>\nIn this diverse group, achieving consensus can be difficult, and knowing everyone\u2019s individual needs is important.\u00a0Angela discussed one instance in which repaired dinosaur skeletons were going on view, and light levels were initially assessed for the bones themselves, though it turned out that the most sensitive material present was the adhesive in the repairs. She also mentioned that they built a standalone mockup so that lighting levels could be experienced by all stakeholders, to get a real sense of what the space would feel like with different lighting, to achieve consensus. I thought this slide was helpful in illustrating all the sub-questions from different stakeholders that are a part of one major design decision.<br \/>\n<a href=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-problem-statement.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-15134 aligncenter\" src=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-problem-statement-300x171.jpg\" alt=\"Hirsch Matchica problem statement\" width=\"361\" height=\"206\" \/><\/a><br \/>\nJeffrey noted that what looks like one construction project is really a number of simultaneous and interdependent projects \u2013 structural, exhibit design, conservation, and so on \u2013 all coming out of basically one pot of money. Scheduling all of this was likened to a symphony, in which it\u2019s very difficult to get the multiple instruments to finish the piece at the same time.<br \/>\n<a href=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-multiple-projects-at-once.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-15132 aligncenter\" src=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-multiple-projects-at-once-300x171.jpg\" alt=\"Hirsch Matchica multiple projects at once\" width=\"356\" height=\"203\" \/><\/a><br \/>\nAs always, communication was underscored as the most essential element. Each group should be aware of how the other groups are progressing, and know if someone\u2019s end date is shifting, and what that means for all the others. On this point, he stressed how important it was to have a contingency amount of funds specified in the budget very early on. Changes cost a lot more at the end then they do at the beginning, so it\u2019s also important to assess all your options early on and make choices then, with full information about the long-term costs of each option. Here, Angela presented the choices between various types of light bulbs, some of which are low cost but require frequent replacement, while spending a bit more at the beginning can lead to major savings in time and materials later in the life of the building \u2013 value engineering.<br \/>\n<a href=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-bulb-choices.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-15136 aligncenter\" src=\"http:\/\/www.conservators-converse.org\/wp-content\/uploads\/2016\/06\/Hirsch-Matchica-bulb-choices-300x170.jpg\" alt=\"Hirsch Matchica bulb choices\" width=\"356\" height=\"202\" \/><\/a><br \/>\nThe end message for all involved parties was to stay at the table, attend all meetings, read and familiarize yourself with all the minutes and notes, and keep track of what decisions are made. No sweat! I still feel like the only way to really know how to predict and prepare for all the things that can go wrong in a construction project is to go through one and learn from your own mistakes \u2013 but it was great to hear from the other side of the table, especially from a team that has a real sense of the wide-ranging and diverse concerns of working in a museum setting and the energy to work towards collaboration.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction projects have been on my mind lately and I thought this would be a good complement to Angela Chang\u2019s presentation about her experiences during two major\u00a0construction projects at the Straus Center (she spoke at the Conservation &amp; Exhibition Planning: Material Testing for Design, Display, and Packing conference in DC in November 2015). Jeffrey Hirsch &hellip; <a href=\"https:\/\/resources.culturalheritage.org\/conservators-converse\/2016\/06\/28\/44th-annual-meeting-collection-care-session-may-15-spoiler-alert-planning-around-the-pitfalls-of-construction-projects-by-jeffrey-hirsch-and-angela-matchica\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;44th Annual Meeting \u2013 Collection Care Session, May 15, &quot;Spoiler alert! Planning around the pitfalls of construction projects&quot; by Jeffrey Hirsch and Angela Matchica&#8221;<\/span><\/a><\/p>\n","protected":false},"author":113,"featured_media":13673,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"footnotes":""},"categories":[2,25,16],"tags":[76,252,305],"class_list":["post-15086","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-annual-meeting","category-collectioncare","category-specialty-sessions","tag-aics-44th-annual-meeting","tag-collection-care","tag-construction-projects"],"_links":{"self":[{"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/posts\/15086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/users\/113"}],"replies":[{"embeddable":true,"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/comments?post=15086"}],"version-history":[{"count":0,"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/posts\/15086\/revisions"}],"wp:attachment":[{"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/media?parent=15086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/categories?post=15086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/resources.culturalheritage.org\/conservators-converse\/wp-json\/wp\/v2\/tags?post=15086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}